2nd alarm Structure fire Ruse ST x Hutton ST Osborne Park
Ambulance requested
CLP requested
WAPOL requested
Structure fully involved. Automotive workshop.
DO Stirling upgraded 3rd Alarm
Ambulance requested
CLP requested
WAPOL requested
Structure fully involved. Automotive workshop.
DO Stirling upgraded 3rd Alarm
-
- Moderator
- Posts: 1198
- Joined: Sun Aug 03, 2008 5:06 pm
- Scanners and Receivers: Uniden UBC60XLT
- Location: Caversham, Perth
Re: Major Structure Fires 2017/18
3rd Alarm Rubbish Tip fire Armadale Recycling Facility, Hopkinson Rd Hilbert
-
- Moderator
- Posts: 1198
- Joined: Sun Aug 03, 2008 5:06 pm
- Scanners and Receivers: Uniden UBC60XLT
- Location: Caversham, Perth
Re: Major Structure Fires 2017/18
5th Alarm structure fire Cecil Av Cannington
Fire is on 6th floor of 9 story Building
Fire is on 6th floor of 9 story Building
Re: Major Structure Fires 2017/18
Third Alarm Structure Fire West Swan Rd Henley Brook
Was reported as a scrub fire but upon arrival it was a scrub fire and shed fire
Was reported as a scrub fire but upon arrival it was a scrub fire and shed fire
Re: Major Structure Fires 2017/18
3rd Alarm Structure Fire Billabong Brewery Myaree
-
- Moderator
- Posts: 1198
- Joined: Sun Aug 03, 2008 5:06 pm
- Scanners and Receivers: Uniden UBC60XLT
- Location: Caversham, Perth
Re: Major Structure Fires 2017/18
Upgraded 4th, 2nd CLP delcined.
Re: Major Structure Fires 2017/18
Third alarm Clarkson High School
Re: Major Structure Fires 2017/18
3rd Alarm House Fire 1 ROBERTS RD in ATTADALE
14:25 Crews informed of possible life involvement and Murdoch SET could see smoke plume so mobilised themselves
14:30 Fremantle 1st arrived 88 3rd Alarm
14:32 Murdoch SET arrived assisting Fremantle 1st until further pumps arrive
14:33 Crew in BA, no life involvement at this stage more info later
14:34 Murdoch Pump and Claremont arrived
14:35 Belmont ICV turning out
14:37 Western Power requested
14:40 Incident known as Roberts Rd Control and require another pump for BA backup
14:44 WAPOL in attendance
14:45 Fremantle 2nd turning out
14:47 Fire has engulfed the roof space crews protecting exposures on either side
14:49 DO Beeliar turning out
14:51 Belmont ICV and Fremantle 2nd arrived
14:54 Another pump requested for BA wear
15:00 CLP requested
15:02 Fremantle CLP turning out
15:07 Fire is contained but not controlled, single storey brick and iron residence, 3 in BA, Western Power on scene, Advice requested to be issued, WAPOL have set up 100m exclusion zone and Fremantle CLP are required on the corner of Roberts Rd and Moreing
15:10 Fremantle CLP arrived and FIO
15:19 BA Crews are withdrawing from the building and CLP is being set up for external attack
15:35 DO Beeliar arrived
15:47 Comcen requested an update
14:25 Crews informed of possible life involvement and Murdoch SET could see smoke plume so mobilised themselves
14:30 Fremantle 1st arrived 88 3rd Alarm
14:32 Murdoch SET arrived assisting Fremantle 1st until further pumps arrive
14:33 Crew in BA, no life involvement at this stage more info later
14:34 Murdoch Pump and Claremont arrived
14:35 Belmont ICV turning out
14:37 Western Power requested
14:40 Incident known as Roberts Rd Control and require another pump for BA backup
14:44 WAPOL in attendance
14:45 Fremantle 2nd turning out
14:47 Fire has engulfed the roof space crews protecting exposures on either side
14:49 DO Beeliar turning out
14:51 Belmont ICV and Fremantle 2nd arrived
14:54 Another pump requested for BA wear
15:00 CLP requested
15:02 Fremantle CLP turning out
15:07 Fire is contained but not controlled, single storey brick and iron residence, 3 in BA, Western Power on scene, Advice requested to be issued, WAPOL have set up 100m exclusion zone and Fremantle CLP are required on the corner of Roberts Rd and Moreing
15:10 Fremantle CLP arrived and FIO
15:19 BA Crews are withdrawing from the building and CLP is being set up for external attack
15:35 DO Beeliar arrived
15:47 Comcen requested an update
Re: Major Structure Fires 2017/18
DBA/3rd Alarm Structure Fire Stirling Highway Cottesloe
17:25 Claremont arrived didn't get the start of the message but has been classified 3rd Alarm Fremantle 2nd proceeding firecall conditions
17:28 Daglish 2nd turning out
17:29 Claremont have sent a person in BA and have discovered someone has set off a fire extinguisher in the derelict building and it is dust from a dry chem extinguisher Fremantle 2nd to proceed normal road.
17:25 Claremont arrived didn't get the start of the message but has been classified 3rd Alarm Fremantle 2nd proceeding firecall conditions
17:28 Daglish 2nd turning out
17:29 Claremont have sent a person in BA and have discovered someone has set off a fire extinguisher in the derelict building and it is dust from a dry chem extinguisher Fremantle 2nd to proceed normal road.
Re: Major Structure Fires 2017/18
Structure Fire Lakes Rd Barragup
17:10 (approx) Mandurah 1st arrived 66 lots of smoke in the area trying to locate the correct building
17:15 Mandurah 1st arrived 88 shed on fire approx 25mx25m with a bus fully involved extra crews requested such as 3x 3.4s or a 7.2 for water and additional appliances for BA
17:18 Mandurah 2nd 3.4 turning out
17:22 Mandurah 2nd LT turning out and 3.4 arrived
17:24 Pinjarra 2.4 and LT turning out
17:28 Mandurah 2nd LT arrived
17:30 West Murray 2.4 turning out
17:35 There are two compartments to the shed one with a trailer, boat and diesel tank which they have stopped penetration. Fire is confined to second compartment with bus which is fully involved, 4 in BA Mandurah 2nd is giving Mandurah 1st water but they are almost out of water. Classification 2nd Alarm.
17:36 Pinjarra arrived
17:40 West Murray 2.4 arrived
17:44 Singleton 2.4 turning out, fire is under control
17:58 Singleton 2.4 arrived
17:59 SET requested normal road
18:04 Fire extinguished
18:05 Murdoch SET turning out
18:09 Singleton 2.4 released
17:10 (approx) Mandurah 1st arrived 66 lots of smoke in the area trying to locate the correct building
17:15 Mandurah 1st arrived 88 shed on fire approx 25mx25m with a bus fully involved extra crews requested such as 3x 3.4s or a 7.2 for water and additional appliances for BA
17:18 Mandurah 2nd 3.4 turning out
17:22 Mandurah 2nd LT turning out and 3.4 arrived
17:24 Pinjarra 2.4 and LT turning out
17:28 Mandurah 2nd LT arrived
17:30 West Murray 2.4 turning out
17:35 There are two compartments to the shed one with a trailer, boat and diesel tank which they have stopped penetration. Fire is confined to second compartment with bus which is fully involved, 4 in BA Mandurah 2nd is giving Mandurah 1st water but they are almost out of water. Classification 2nd Alarm.
17:36 Pinjarra arrived
17:40 West Murray 2.4 arrived
17:44 Singleton 2.4 turning out, fire is under control
17:58 Singleton 2.4 arrived
17:59 SET requested normal road
18:04 Fire extinguished
18:05 Murdoch SET turning out
18:09 Singleton 2.4 released
-
- Moderator
- Posts: 1198
- Joined: Sun Aug 03, 2008 5:06 pm
- Scanners and Receivers: Uniden UBC60XLT
- Location: Caversham, Perth
Re: Major Structure Fires 2017/18
3rd alarm structure fire National Storage James st Guildford