From Yesterday
Both the NG and the Perry (the two steam locomotives) were out for maintenance... so the Fowler "Rosalie" was chosen to go for a run for the day.
The Guard did not show up, so I was the guard for the day.
The Train Approaching Whiteman Village Junction from the Bushland Loop
Me unhooking the Locomotive from the carriages
The Lever Arch Frame at Mussle Pool Station - Still fully operational, used when the train runs around to drive back up the hill
Red indicates a Signal, Black is a Point, and Blue is a Point Locking Mechanism
A look at some of the signals, The Two Semaphore signals you see are fully operational, and you can see a "cheese knob" point lever in between them. This is for the road to the workshops. Where the main and loop line converge (near where the Loco is) is the points the frame are operating. (Levers 3 and 4)
Signalling the Driver in (that signal means come towards me slowly - yes, the hands do move)
The Jones Couplers Meeting... as the train moves back, the "chopper" drops in, and the bar you see is moved in over the chopper as a safety device, to prevent the carriages from detaching from the Loco - above you can see the vacuum brake pipes.
Approaching the Junction, with the Outer Home Signal at "Proceed"
again approaching the Junction, and through the Scissor Crossover with Red indicating that the train will be going from this track, to the other. As it is a scissor crossing, there are two indicators, one for each track - on approach from the loop. the Left must be Red, indicating that you are crossing tracks, and the right does not matter, but on approach from Mussle Pool, both must be green, as you are continuing on that line to Platform One
so there you go, there is some video - and I will try and get that up eventually
