Information on Perth airport works

The latest cycle of Jeppesen indicate 4 stages of works starting in December

Description of works
This method of working plan involves the asphalt resurfacing of taxiways D1 J1 J2 and A1, reconstruction and resurfacing of Taxiway W, resurfacing of runway 06 threshold, construction of Taxiway V east of RWY 06/24 (partial construction), construction of new taxiway A extension (between J2 and D1) and removal of inoperative TWY D2. A six week full 24 hour closure of RWY 06/24 will apply from the commencement of stage 3 to the end of the works. Stage 4 works will involve night work. Disruption to aircraft operations is expected.

Stage 1 and 2 are works on extension ofTWY W, and TWY A to join TWY D1
Stage 3 is TWY D1 intersection with H2 and H3, and RWY 06/24, TWY W and A Extension Duration 3 weeks commencing EST 31 JAN 11, during which RWY 06/24 will be closed.
Stage 4 RWY 06/24 works, Resurfacing of J1 J2 and A1, Removal of inoperative TWY D2, TWY A Extension Commencement EST 21 FEB 11

EST Completion date 11 MAR 11

Airport Diagram of works
http://docs.google.com/gview?url=http:/ ... /works.pdf

Re: Perth airport works 2011

Posted: Tue Feb 15, 2011 6:03 pm
by Nafenn
Some minor Construction works on bay 17 today: new cement... don't know why, but they re-paved the grassed area in the middle:

http://www.nearmap.com/?ll=-31.934406,1 ... d=20110108

Re: Perth airport works 2011

Posted: Wed Feb 16, 2011 3:53 pm
by Helitak_670
It's for the Virgin A332 (bay 17 ext)

Re: Perth airport works 2011

Posted: Wed Feb 16, 2011 6:08 pm
by Nafenn
I asked the guys working on it today, and they told me that it was for Extended GSE storage (Ground Servicing Equiptment for those playing at home)

Re: Perth airport works 2011

Posted: Thu Feb 17, 2011 12:47 pm
by Helitak_670
well that has me buggered. I have spoken to a few safety officers and they have all said for the a330.

Re: Perth airport works 2011

Posted: Thu Feb 17, 2011 1:12 pm
by Infernal
Helitak_670 wrote:well that has me buggered. I have spoken to a few safety officers and they have all said for the a330.

They were using the Bay again this morning, had a Fokker 100 on it.

Re: Perth airport works 2011

Posted: Thu Feb 24, 2011 12:01 am
by Boeta
Helitak_670 wrote:well that has me buggered. I have spoken to a few safety officers and they have all said for the a330.
You're both correct, its to allow the A330 pushback tug to park with adequate repositioning room/GSE storage

Re: Perth airport works 2011

Posted: Wed Mar 02, 2011 8:00 am
by Geoff
http://au.news.yahoo.com/thewest/a/-/breaking/8935487/history-bows-to-new-airport-era/ wrote: History bows to new airport era

Nearly 50 years of aviation history started to come down yesterday to make way for new taxiways for the the expansion of Perth Airport.

Over the next two months, the old control tower, built in 1961, will be dismantled carefully so as not to create dust and debris that can be ingested into aircraft engines.

...

Perth Airport will use the area for new taxiways to allow for the movement of wide-body A330 and Boeing 747s which currently cannot taxi past the tower because of the big wingspan.

This problem causes considerable delays on departure and arrival from the domestic terminal depending on wind conditions.

...
The full article can be read via the link above.


Geoff

Re: Perth airport works 2011

Posted: Wed Mar 02, 2011 9:37 am
by Nafenn
Finally!

Re: Perth airport works 2011

Posted: Mon Mar 14, 2011 12:42 pm
by Nathan127
Heya Guys

As You May Know The New Aerobridges for 19-20 Are Well Underway They are built off station and are being placed once fully built i decided to share with you guys the plan for the Aerobridges For Discussion

Image

Re: Perth airport works 2011

Posted: Mon Mar 14, 2011 6:53 pm
by Infernal
I saw construction had started, interesting they are missing out BAY 18.

Also that would mess up the numbering inside the terminals, AFIAIK from my last flight the Island where the Dual Aerobridges for bay 19, are labeled inside gates 25-33 (not 100% sure on the actual numbers)

Re: Perth airport works 2011

Posted: Mon Mar 28, 2011 12:18 pm
by Nathan127
They Are Leaving Out 18 Due To The A330 Gouig On 17 It Will Wipe Out !8 Completely S They Cannot Have An Aerobridge

Re: Perth airport works 2011

Posted: Sun Dec 25, 2011 2:11 pm
by Infernal
Taxiway A Extension is Complete and now in use, Delete H2 H1 and F

Taxiway V Extension from RWY 06 to A and then 21 and then C is partially completed

Taxiway A is now A for the full length, Delete A1 A2 and A3 segments

Taxiway D1 is now D only delete D1 and D2, D2 Segment to be removed